2 week notice letter
A 2 week notice letter states that you are leaving and names a last day two weeks after the notice. Two weeks is 14 calendar days; how many work days sit in that window depends on weekends.
How it works
Two weeks’ notice is a counting problem with a letter attached. You pick the day you give notice. You count 14 calendar days forward. That date is two weeks later. Whether that date is your last working day, or the day after your last working day, is a policy question, not an arithmetic one. The letter exists so both sides can see the same two dates: the date of notice and the date you mean to stop.
A typical two-week block that starts on a Monday and aims at the Friday of the following week is not 14 calendar days. Monday to the next Friday is less than a fortnight. Monday to the Monday two weeks later is 14 days later. If your workplace counts work days rather than calendar days, two weeks of Monday-to-Friday work is 10 work days, still assuming no holiday sits in the window. Do not guess which rule applies. Read the contract, handbook, or the instruction you were given. This page counts. It does not replace that document.
Give the letter on a working day if you can, because a notice handed over on a Friday still starts a calendar count that includes the weekend unless the policy says otherwise. Silence in the policy usually means calendar days, but “usually” is not a substitute for the text you signed.
Write today’s date on the letter. That is the notice date. Count 14 calendar days forward, or count 10 weekdays if the rule is work days, and write the last day you mean. Say that you are resigning, in those words or the words the workplace uses.
Name the last day of work as a full date, not “in two weeks.” Keep a copy. A count nobody can find later is not a count.
Counting the two weeks
From the 1st, 14 calendar days later is the 15th of the same month if the month has enough days. From the 20th of a 30-day month, 14 days later is the 4th of the next month. Inclusive counting would call the notice date day one and land earlier; that is the wrong count for “two weeks from today” in ordinary English. “Two weeks from today” is today plus 14 days.
If a holiday falls in the window, calendar-day notice still ends on the same calendar date. Work-day notice may run long if holidays do not count as notice days. Again the policy, not the proverb, decides. A 2 week notice letter that forgets to print the last day leaves that fork unsolved.
Two weeks’ notice is a calendar promise. The letter is the promise with a date on it, so nobody has to reconstruct the fortnight from memory.
What the letter is for, and what it is not
The letter is a dated record. It can thank people and offer a handover, and those sentences are courtesy. They do not change the count. It is not a court form. Requirements differ by country, job, and contract. Some roles have a longer notice period written down. Some have none. If the written period is a month, a 2 week notice letter is the wrong length no matter how neatly you counted 14 days.
Print the last day as a calendar date with a year. “Friday week” is a weekday nickname. It is a poor substitute when Friday week and a 14-day count do not land on the same square.
Questions and answers
- Is two weeks always 14 days?
- Two weeks is 14 calendar days. A workplace may instead count 10 weekdays. Use the rule in the contract or handbook.
- Do weekends count in a 2 week notice letter?
- They count in a calendar-day fortnight. They may not count if the notice period is defined in work days. The letter should still name a last calendar date.
- What date do I put as the last day?
- The date your chosen rule lands on, written in full. Do not write only “two weeks from now.”
Related guides
10 year anniversary
A 10 year anniversary is the same month and day ten civil years after the original date. If that day does not exist in the later year, pick 28 February or 1 March and say which.
10000 days
10,000 days is a little more than 27 years: 27 × 365 = 9,855 days, so 145 days remain if you ignore leap days.
107 days
107 days is a span of 107 midnights on the civil calendar: 15 weeks and 2 days. From Thursday 3 September 2026 that span ends on Saturday 19 December 2026.